Natutec_Airobreez_-_Directions_for_Use_-_Koppert.pdf
switch in the throw
position (A).
The fan comes on and the speed of
the fan increases slowly. No product
is blown from the device.
3. When the fan is at full [...] speed, put the
power switch in the dose position (B).
The fan stays on. The product is
blown from the device.
6.3.2
A
B
A
B
Stop the device
Procedure [...] in the reservoir on the
side of the device. The bucket ring inside the reservoir continually mixes the product. At
the same time, the bucket ring puts